High speed trains depot equipment

Our solution

  • Layout and process flow improvements
  • Machines adapted for different track gauges
  • More than 10 machines/equipment for the workshop

Previous machining process

Old workshop with old equipment

Advantages

  • Improved productivity
  • Management of 2 different track gauges in the same workshop

Installation Consists of

  • Variable track gauge underfloor wheel lathe
  • Vertical lathe for wheels
  • Boring machine for wheels
  • Horizontal lathe for axles
  • Horizontal lathe for wheelsets
  • Wheel press
  • Balancing equipment
Back to Case Studies